The Palm County – Economy Villa

Mookkannur, Angamaly,
Ernakulam (dist) - 683 577
+91 9847649077
sonypaul@paulantonybuilders.com

The Palm County – Economy Villa
Mookkannur – Angamaly

Paul Antony Builders brings to you The Palm County – Economy Villa, situated at Mookkannur, Kochi’s greenest suburban landscape. The Palm County – Budget Villa is conveniently located with respect to the Cochin International Airport.

The Palm County – Economy Villa is a quaint township of 100 villas in 12.5 acres that have been constructed keeping all modern amenities in mind. The ambience of this villa project ensures that one is close to all convenience and infrastructure, and yet far away from the crowd and bustle of the busy city.

Enjoy a game or two at the basketball and badminton courts. Let the still waters and fresh blooms soothe your senses with nature’s beauty through a natural pond. The grand clubhouse is a heaven for social gatherings when you feel like spending time in the good company of your neighbours. Along with indoor arcade games, a billiards table and a comfortable lounge area, the clubhouse also provides a state- of- the- art gym and health centre for your fitness and well being. The vibrant gardens and lawns lend an artistic touch to the clean and simple architecture of The Palm County – Budget Villas near Cochin International Airport.

Economy villas that offer you safety, comfort and an address that says it all.

Own your bit of heaven at The Palm County – Economy Villa, where luxury meets serenity.

Home Care - Taking Care of Your Home

Understanding the consternation of families who leave their homes unattended for long periods, Paul Antony builders & Developers have decided to extend their expertise to the home care segment as paid amenities, Occupants at “The Palm County” can now entrust our Support to take care of their home in their absence. If required, we shall arrange to lease your home to ideal occupants, collect the monthly rentals and deposit the same in your account.

VIEW OUR BROCHURE

  • Amenities
  • Specifications
  • Floor Plans
  • Location Map
  • Distance
  • Gallery
  • Architectures Talks
  • Ebrouchure
  • Videos
  • Payment Schedule

COMMON AMENITIES

  • Children's play area
  • Badminton court 
  • Basket ball
  • Natural pond with amphitheatre
  • Solid Waste Management System
  • Care Taker
  • Generator back up with common area
  • 24 hrs security
  • Cricket net practice with bowling machine.
  • 24 hrs security camera survellance
  • Calm and pollution free environment
  • Landscaped garden
  • Help desk- tourism, nearest pilgrims, hospitals...

CLUB HOUSE

  • Multi gym
  • Yoga & Meditation Centre
  • Table Tennis
  • Billiards
  • Cards
  • Caroms
  • Chess

FOUNDATION

  • Earthwork excavation including back filling.
  • Rubble foundation with RCC belt all around as per structural engineer.
  • Filling the plinth with selected excavated earth and red earth.

SUPER STRUCTURE

  • Wall Masonry: Hydraulic high pressure pressed cement solid blocks for wall and super structure.
  • R.C.C Lintel 15cm x 20 cm all around at 210 cm high from floor level.
  • R.C.C. M20 Grade slab for sunshade, drops, slabs etc.. as per drawings.
  • Waterproofing done for open terrace roof, slope roof slab and bathroom floors.
  • Plastering in cement mortar 1:4 for internal/external surface of walls and roof as per specification.
  • Plastering in cement mortar 1:3 for roof ceiling as per specification.
  • Stair is made of GI square tube frame & wooden paneling.
  • Parapet up to height of 60 cm for open terrace area.

FLOORING

  • Anti-termite treatment provided for foundation.
  • Flooring with P.C.C on ground floor surface.
  • Vitrified floor tiles 80cm x 80cm for sit out, bed rooms, living area .
  • Ceramic/Vitrified Matt floor tiles 60cm x 60 cm for kitchen area .
  • Toilet wall tiles 30cm x 45cm .
  • Antiskid tiles for toilet floor 30cm x 30cm.
  • Granite with edge rounding on Kitchen slab top .

PAINTING

  • Two coat premium emulsion for Exterior walls (with 2 coat exterior putty on front side only).
  • Two coat Putty , Primer and 2 coats Premium Emulsion for interior walls.
  • Ceiling 2 coats emulsion pure white colour.
  • One coat primer and two coat enamel for all other doors and windows.
  • One coat primer and one coat enamel for grills.

(Unit rate of all materials shown in above material specification include, Taxes, Transportation,loading and unloading charges. Agreement amount excludes Front yard tile, wardrobes, other furniture, cost of water heaters, motor-pump set, fans, lights fittings, kitchen cabinets etc., if necessary it will be done on additional cost from customer)

JOINERY

  • All windows frames & shutters in UPVC.
  • All inside door in UPVC and Flush Door.
  • Ground floor front door Hard wood.
  • Readymade PU doors for bathrooms.
  • Stainless steel hardware and Locks ISI mark for doors and windows.
  • Main front door hardware in brass fittings.
  • Stair case: SS 304 GRADE wood finished rail with glass hand rails.
  • (Cupboards/ward robes, Landscaping and front yard tile-optional)

ELECTRICAL

  • Electrical concealed copper wiring (Finolex/ V- guard or ISI CERTIFIED COMPANY).
  • Three phase wiring ELCB, MCB fittings and proper earthing.
  • Switches: Legrand /ABB/Crabtree.
  • Sit out, Foyer: 2 light point, 1 bell push point,1 ceiling point.
  • Living room: 2 lights point,1 fan point, 3-5A point, 1 TV point.
  • Kitchen: 2 light points, 1 fan point, 1 exhaust fan point , 2-5A points, 2-15A points.
  • Bedroom: 2 Light point, 1 fan point , 2- 5A points, Toilet Foot Lamp,1 AC point.
  • Toilets: 1 Light point , 1 exhaust fan point , 1-5A point, mirror lamp point, geyser point, footlamp point.
  • 4 External lights all around 1 Light at all terrace level.
  • All electrical fittings extra.
  • Additional points will be charged extra.
  • Inverter point provision for lights ,fans and AC points.
  • Provision for a generator, Inverter point and solar water heater.
  • (Water heaters, AC, Inverter etc. on customer cost (KSEB and water connection expenses extra).

PLUMBING AND SANITARY

  • Concealed cold water supply pipes in good quality PVC pipes (ISI) in toilets and kitchen - supreme/ Hi count.
  • Concealed hot water supply pipes in good quality CPVC pipes in toilets and kitchen - supreme/ Hi count.
  • PVC drainage pipe 4kg/cm2.
  • Tap and accessories: Cera -Dew in all toilet and kitchen.
  • Providing sanitary wares in all the toilet.
  • Toilets:1 15cm shower with arm + 1 Mixer for Shower area, 1 Health faucet , 1 Wash basin tap .
  • Fittings-Toilets: 1 Washbasin without counter, 1 Wall mount EWC with soft close seat and concealed flush
  • Kitchen: SS Kitchen sink single Bowl, sink tap .
  • Dining hall: Wash basin 1 nos , tap 1 nos .
  • Pre cast Septic tank, and Ground level sump (1000 Litres), Overhead water PVC tank (1000)
Villas for Sale in Ernakulam
Villas for Sale in Ernakulam
Villas for Sale in Ernakulam
Villas for Sale in Ernakulam
Villas for Sale in Ernakulam
Villas for Sale in Cochin
# LOCATIONS DISTANCES
1 Cochin International Airport 12 km
2 Angamaly Town 10 km
3 Mookkanur Town 4.5 km
4 NH 47, M.C Road 9 km
5 Athirapally Waterfalls 15 km
6 Adi Shankara Town 10 km
7 Info Park Koratty 7 KM
8 SCMS, FISAT Engg. Colleges 4 km
9 MAGJ, LF Hospitals 4 km
10 Vijopuram Church 0 km

Our Architects

Ar. Anjith Augustine-B. Arch, M.Arch UD (SPA .New Delhi)
Principal Architect ,City+Futures Design collaborative,
Ar. Rakhi Mariam Johnson -B. Arch, M.Arch (SPA .New Delhi)

Content will be updated...

Content will be updated...

PAYMENT SCHEDULE

INST NO. WORK DETAILS % OF TOTAL AMOUNT DUE DATE FOR INSTALMENT
1 On or before land registration 40 Before registration of land or within 1 month of booking
2 Land development foundation 5 Within 1 month of land registration or within 2 months of booking
3 Ground floor brick work, lintel & main slab casting 10 1 month after 2 nd instalment
4 Advance of wood purchase 5 20 days after 3 rd instalment
5 First floor brick work, lintel & main slab casting 10 20 days after 4 th instalment
6 Window, door frame fixing & plastering work 7 45 days after 5th instalment
7 Plumb. Conduct work Window Shutter fitting & wall putty + Primer painting 6 2 months after 6th instalment
8 Flooring work 6 1 month after 7nth instalment
9 Sanitary & balance electric work 6 1 month after 8 instalment
10 Painting & polishing + door fitting 4 20 days after 9 nth instalment
11 Final finishing work 1 At the time of key handing over
  TOTAL % 100  
Content